SYNOPSIS
Geotechnical design and site supervision, accounting sale
PROJECT COST
420,000 euro
PROJECT DESCRIPTION
Stabilization of a slope in the village of Rivalba. This has been carried out to reduce the risk posed to traffic along via Vignola.
The design by North West Engineering S.r.l. consists of a reinforced concrete structure grounded on 10 metre long concrete micropiles covering a stretch of 60 metres.
A live cribwall created from timber members was installed along via Vignola in order to stabilize the slope.
The cross-section of the live cribwall is 2 x 2 metres and the base was inclined by 10 degrees to the horizontal. In-situ investigation, geotechnical design and site supervision have been carried out by North West Engineering S.r.l.
YEAR
2015