Detailed design of railway equipment for the Bologna – Florence high-speed railway

PROJECT COST

860,000,000 dollari

PROJECT DESCRIPTION

This high-speed line connects Bologna and Florence. The total length is 78.5 kilometres with 73.3 kilometres of it below ground. The railway has two tracks. The total number of work projects is 430 with nine tunnels and six viaducts. Masera Engineering Group carried out the detailed design of railway equipment for the stretch between 4+844.24 kilometres and 83+368 kilometres.

YEAR

1995